108 kW, 2013. One of Western Australia’s most challenging installations is on one of its most iconic buildings.
167 kW, 2013. Winner of the national CEC Solar Design and Installation Awards over 100 kW.
As one of Perth’s largest aquatic centres, power consumption is very high. The 37.5 kW system helps reduce this.
City of Stirling was another council that decided to install a 36 kW array on their administration building.
An extremely difficult install due to the aged and fragile tiles. The end result is a multi-oriented 36 kW array with impressive yields.
Craigie Leisure was one of the first leisure centres to adopt solar PV. This installation paved the way for many more like it.
The 36 kW array installed for Wanneroo Aquamotion has helped offset the large cost of running an aquatic centre.
TADWA focuses on using and developing technology to help disabled people in WA. This PV system helps reduce their costs.
Proin nunc erat, ullamcorper at congue quis, dictum id magna. Morbi id mi in diam gravida faucibus. Suspendisse sapien nisi, efficitur eget libero eget, egestas iaculis ex.
Proin nunc erat, ullamcorper at congue quis, dictum id magna. Morbi id mi in diam gravida faucibus. Suspendisse sapien nisi, efficitur eget libero eget, egestas iaculis ex.
Proin nunc erat, ullamcorper at congue quis, dictum id magna. Morbi id mi in diam gravida faucibus. Suspendisse sapien nisi, efficitur eget libero eget, egestas iaculis ex.
Proin nunc erat, ullamcorper at congue quis, dictum id magna. Morbi id mi in diam gravida faucibus. Suspendisse sapien nisi, efficitur eget libero eget, egestas iaculis ex.
NextPower offers a wide range of services, from consultation to installation, maintenance, and financing. We’re here to help you make the switch to clean energy.
Copyright 2022 © All Right Reserved by Next Power